  "schema_version": "1.0",
  "language": "en",
  "content_revision": "2026-11-27",
  "verification_note": "A content revision is not a new verification of every source. See source dates and procurement review dates.",
  "project_count": 25,
  "amount_unit": "USD millions",
  "fx": {
    "gtqPerUsd": 7.65281,
    "date": "2026-11-27",
    "source": "https://www.banguat.gob.gt/tipo_cambio/"
  },
  "procurement_review_date": "2026-11-25",
  "notices": [
    {
      "id": "idb-39755",
      "projectIds": [
        "ca9-teculutan-mayuelas"
      ],
      "status": "eoi",
      "title": [
        "Supervisión de la ampliación a cuatro carriles.",
        "Supervision of the four-lane widening works.",
        "Supervision des travaux de mise à quatre voies.",
        "4차로 확장 공사 감리.",
        "4車線への拡幅工事の施工監理。"
      ],
      "summary": [
        "Firmas de ingeniería con experiencia en supervisión vial.",
        "Engineering firms experienced in road construction supervision.",
        "Bureaux d’ingénierie expérimentés en supervision de travaux routiers.",
        "도로 공사 감리 경험이 있는 엔지니어링 회사.",
        "道路工事の施工監理経験があるエンジニアリング会社。"
      ],
      "buyer": "CIV",
      "noticeId": "39755",
      "publicationDate": "2026-11-19",
      "deadline": "2027-01-29T15:00:00-06:00",
      "nog": "32817096",
      "verifiedAt": "2026-11-24",
      "url": "https://www.iadb.org/idb-pdf-proxy/EZIDB0000271-2062991416-20",
      "recordUrl": "https://data.iadb.org/es/api/action/datastore_search?resource_id=856aabfd-2c6a-48fb-a8b8-19f3ff443618&q=39755"
    },
    {
      "id": "UNDP-GTM-00294",
      "noticeId": "UNDP-GTM-00294",
      "projectIds": [
        "onu-estadio"
      ],
      "title": [
        "Obras de mejoramiento del estadio",
        "Stadium improvement works",
        "Travaux de modernisation du stade",
        "경기장 개선 공사",
        "競技場改修工事"
      ],
      "summary": [
        "Contratación de las obras. Este aviso corresponde al mismo estadio que el proceso de supervisión UNDP-GTM-00300; son contratos distintos de un único proyecto.",
        "Procurement of construction works. This notice concerns the same stadium as supervision process UNDP-GTM-00300: separate contracts within one project.",
        "Marché de travaux. Même stade que la supervision UNDP-GTM-00300 : deux contrats pour un seul projet.",
        "공사 계약입니다. 감리 절차 UNDP-GTM-00300과 같은 경기장 사업에 속하며 별도 사업이 아닙니다.",
        "工事の調達です。監理手続UNDP-GTM-00300と同じ競技場事業に属する別契約です。"
      ],
      "buyer": "CDAG · PNUD",
      "publicationDate": "2026-10-03",
      "deadline": "2026-11-19T18:00:00-04:00",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/316749",
      "sourceUrl": "https://www.ungm.org/Public/Notice/316749",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "UNDP-GTM-00300",
      "noticeId": "UNDP-GTM-00300",
      "projectIds": [
        "onu-estadio"
      ],
      "title": [
        "Supervisión de las obras del estadio",
        "Supervision of stadium works",
        "Supervision des travaux du stade",
        "경기장 공사 감리",
        "競技場工事の監理"
      ],
      "summary": [
        "Contratación del servicio de supervisión de las obras, separado del contrato de construcción UNDP-GTM-00294. Ambos procesos pertenecen a un único proyecto de mejoramiento del estadio.",
        "Procurement of works supervision services, separate from construction contract UNDP-GTM-00294. Both processes belong to one stadium improvement project.",
        "Services de supervision, distincts du marché de travaux UNDP-GTM-00294. Les deux procédures concernent un seul projet de modernisation du stade.",
        "공사 계약 UNDP-GTM-00294와 별도로 발주되는 감리 용역입니다. 두 절차는 하나의 경기장 개선 사업에 속합니다.",
        "工事契約UNDP-GTM-00294とは別の監理業務の調達です。両手続は1件の競技場改修事業に属します。"
      ],
      "buyer": "CDAG · PNUD",
      "publicationDate": "2026-10-29",
      "deadline": "2026-12-03T18:00:00-04:00",
      "status": "open",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/320250",
      "sourceUrl": "https://www.ungm.org/Public/Notice/320250",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "RFP/2026/63797",
      "noticeId": "RFP/2026/63797",
      "projectIds": [
        "onu-igss-zona5"
      ],
      "title": [
        "Hospital General IGSS Zona 5",
        "IGSS Zone 5 General Hospital",
        "Hôpital général IGSS zone 5",
        "IGSS 5구역 종합병원",
        "IGSS第5区総合病院"
      ],
      "summary": [
        "Infraestructura hospitalaria de INFRAIGSS. La licitación de construcción cerró el 1 de octubre de 2026; adjudicación e inicio de obra por confirmar.",
        "INFRAIGSS hospital infrastructure. Construction bidding closed 1 October 2026; award and construction start remain unverified.",
        "Infrastructure hospitalière INFRAIGSS. Appel clos le 1er octobre 2026 ; attribution et démarrage à confirmer.",
        "INFRAIGSS 병원 인프라. 공사 입찰은 2026년 10월 1일 마감됐으며 낙찰·착공은 미확인입니다.",
        "INFRAIGSS病院施設。工事入札は2026年10月1日に終了。落札と着工は未確認です。"
      ],
      "buyer": "IGSS · UNOPS · INFRAIGSS",
      "publicationDate": "2026-08-06",
      "deadline": "2026-10-01T23:00:00Z",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/309929",
      "sourceUrl": "https://www.ungm.org/Public/Notice/309929",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "CI92858-006-2026",
      "noticeId": "CI92858-006-2026",
      "projectIds": [
        "onu-pachalum-preinversion"
      ],
      "title": [
        "Preinversión de residuos · Pachalum",
        "Waste infrastructure preparation · Pachalum",
        "Préinvestissement déchets · Pachalum",
        "폐기물 인프라 사전투자 · Pachalum",
        "廃棄物施設の事前投資・Pachalum"
      ],
      "summary": [
        "Estudio de prefactibilidad dentro del Proyecto Motagua MARN–PNUD–GEF, cuyo programa está en curso hasta diciembre de 2026. Resultado del estudio y contratación de obra no verificados.",
        "Prefeasibility study within the MARN–UNDP–GEF Motagua programme, running through December 2026. Study outcome and works procurement remain unverified.",
        "Étude de préfaisabilité du programme Motagua MARN–PNUD–GEF, en cours jusqu’en décembre 2026. Résultat de l’étude et marché de travaux non vérifiés.",
        "2026년 12월까지 진행되는 MARN–UNDP–GEF Motagua 프로그램의 사전타당성 조사입니다. 조사 결과와 공사 계약은 미확인입니다.",
        "2026年12月まで継続するMARN–UNDP–GEF Motagua事業内の予備調査。調査結果と工事調達は未確認です。"
      ],
      "buyer": "MARN · PNUD · GEF · Proyecto Motagua92858",
      "publicationDate": null,
      "deadline": "2026-02-19T13:00:00-06:00",
      "status": "closed",
      "verifiedAt": "2026-11-25",
      "verified": "2026-11-25",
      "lastVerified": "2026-11-25",
      "url": "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
      "sourceUrl": "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "UNDP-GTM-00292",
      "noticeId": "UNDP-GTM-00292",
      "projectIds": [
        "onu-comedores"
      ],
      "title": [
        "Comedores: obras hidrosanitarias, remozamiento y ventilación",
        "Dining facilities: plumbing, refurbishment and ventilation",
        "Cantines : plomberie, rénovation et ventilation",
        "급식시설: 급배수·개보수·환기 공사",
        "食堂：給排水・改修・換気工事"
      ],
      "summary": [
        "Paquete para los comedores FEGUA y Roosevelt. Las instalaciones eléctricas se contrataron mediante otro aviso del mismo proyecto agrupado.",
        "Package for the FEGUA and Roosevelt dining facilities. Electrical installations are covered by a separate notice within the same grouped project.",
        "Lot pour les cantines FEGUA et Roosevelt. Les installations électriques relèvent d’un autre avis du même projet regroupé.",
        "FEGUA·Roosevelt 급식시설 공사입니다. 전기설비는 같은 통합 사업의 별도 공고에 해당합니다.",
        "FEGUA・Roosevelt食堂向けの工事です。電気設備は同じ統合事業の別公告です。"
      ],
      "buyer": "MIDES · PNUD · Proyecto01002876",
      "publicationDate": "2026-09-21",
      "deadline": "2026-10-19T19:00:00-04:00",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/315032",
      "sourceUrl": "https://www.ungm.org/Public/Notice/315032",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "UNDP-GTM-00286",
      "noticeId": "UNDP-GTM-00286",
      "projectIds": [
        "onu-comedores"
      ],
      "title": [
        "Comedores: instalaciones eléctricas",
        "Dining facilities: electrical installations",
        "Cantines : installations électriques",
        "급식시설: 전기설비",
        "食堂：電気設備"
      ],
      "summary": [
        "Paquete eléctrico para los comedores FEGUA y Roosevelt. Es un contrato diferente al paquete hidrosanitario, de remozamiento y ventilación; no constituye otro proyecto.",
        "Electrical package for the FEGUA and Roosevelt dining facilities. A separate contract from plumbing, refurbishment and ventilation, not an additional project.",
        "Lot électrique des cantines FEGUA et Roosevelt. Contrat distinct du lot plomberie, rénovation et ventilation ; aucun projet supplémentaire.",
        "FEGUA·Roosevelt 급식시설 전기설비 계약입니다. 급배수·개보수·환기 계약과 구분되지만 별도 사업은 아닙니다.",
        "FEGUA・Roosevelt食堂の電気設備契約です。給排水・改修・換気とは別契約ですが、別事業ではありません。"
      ],
      "buyer": "MIDES · PNUD · Proyecto01002876",
      "publicationDate": "2026-08-24",
      "deadline": "2026-09-14T12:00:00-04:00",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/312137",
      "sourceUrl": "https://www.ungm.org/Public/Notice/312137",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    }
  ],
  "projects": [
    {
      "id": "ani-01",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Radial 6 · CA-1 West–CA-9 South connection",
      "summary": "CA-1 West–CA-9 South connection. The official ANI profile is the scope and cost reference.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · Guatemala Municipality",
      "location": "Metropolitan area · Sacatepéquez",
      "amount_usd_millions": 158,
      "amount_display": "US$158 M",
      "amount_basis": "Official ANI profile · selected reference",
      "amount_source_date": "Sin fecha publicada · consulta 13 nov. 2026",
      "source_amount": 158,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Traffic studies, road engineering and transaction advisory.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-01/en/",
      "sources": [
        {
          "id": "S21",
          "url": "https://anadie.gob.gt/project/ca1-occidente-ca9-sur/",
          "publisher": "ANI",
          "date": null,
          "title": "Radial 6: institutional project profile"
        },
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-02",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "North–East Metropolitan Road Connection",
      "summary": "Metropolitan corridor identified for potential PPP development.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Guatemala metropolitan area",
      "amount_usd_millions": 1227,
      "amount_display": "US$1,227 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 1227,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Metropolitan planning, traffic modelling and road design.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-02/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-03",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Public Transport Transfer Centre",
      "summary": "Transport interchange included in the ANI portfolio.",
      "sector": "Mobility",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Mixco",
      "amount_usd_millions": 38,
      "amount_display": "US$38 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 38,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Terminal design, transport integration and user research.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-03/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-04",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Petén Itzá Transmission System",
      "summary": "Substation and associated transmission infrastructure under assessment.",
      "sector": "Energy",
      "sector_key": "Energía",
      "sector_slug": "energy",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Petén",
      "amount_usd_millions": 200,
      "amount_display": "US$200 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 200,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Electrical engineering, grid studies and environmental analysis.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-04/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-05",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "San Mateo Ixtatán Transmission System",
      "summary": "Substation and associated line included as an energy initiative.",
      "sector": "Energy",
      "sector_key": "Energía",
      "sector_slug": "energy",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Huehuetenango",
      "amount_usd_millions": 13,
      "amount_display": "US$13 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 13,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Transmission studies, surveying and spatial planning.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-05/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-06",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Regional Electricity Transmission Network",
      "summary": "Regional programme of substations and transmission lines.",
      "sector": "Energy",
      "sector_key": "Energía",
      "sector_slug": "energy",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Several departments",
      "amount_usd_millions": 104,
      "amount_display": "US$104 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 104,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Power-system planning, modelling and financial advisory.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-06/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-07",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Waste Management and Circular Economy",
      "summary": "One programme covering four territories, counted once.",
      "sector": "Sanitation",
      "sector_key": "Saneamiento",
      "sector_slug": "water-waste",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "MASUR · Sololá · MANCOMUSAC · Gran Ciudad del Sur",
      "amount_usd_millions": 301,
      "amount_display": "US$301 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 301,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Resource-recovery technologies, waste logistics and applied research.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-07/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-08",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Regional Airfield Modernisation",
      "summary": "Regional airport package under assessment.",
      "sector": "Airports",
      "sector_key": "Aeropuertos",
      "sector_slug": "airports",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Quetzaltenango · Puerto Barrios · Huehuetenango",
      "amount_usd_millions": 75,
      "amount_display": "US$75 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 75,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Airport planning, aviation engineering and specialist services.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-08/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-09",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Femicide and Family Justice Centre",
      "summary": "Specialised public building included in the ANI portfolio.",
      "sector": "Public buildings",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Guatemala City",
      "amount_usd_millions": 58,
      "amount_display": "US$58 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 58,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Institutional architecture, accessible design and facilities management.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-09/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "ani-10",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Finca El Jaibal Tourism Infrastructure",
      "summary": "Tourism infrastructure with cable transport under assessment.",
      "sector": "Tourism",
      "sector_key": "Turismo",
      "sector_slug": "tourism",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Under assessment",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Sololá",
      "amount_usd_millions": 65,
      "amount_display": "US$65 M",
      "amount_basis": "Portfolio estimate · not committed",
      "amount_source_date": "Sep. 2026",
      "source_amount": 65,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Tourism planning, landscape design and operating models.",
      "next_step": "Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal.",
      "url": "https://guatemalainfrastructure.org/projects/ani-10/en/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "ANI portfolio announced in August 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Ten strategic projects: list and locations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Strategic portfolio: investment and structure table"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA: ANI launches ten projects"
        }
      ]
    },
    {
      "id": "epq",
      "portfolio_class": "ani-contracted",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 · contrato APP existente / existing PPP contract",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://anadie.gob.gt/project/autopista-escuintla-puerto-quetzal/"
      ],
      "name": "Escuintla–Puerto Quetzal Highway",
      "summary": "Approved PPP contract; an existing awarded project.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Public-private partnership (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Construction reported",
      "stage_key": "Construcción reportada",
      "owner": "CIV · ANI · CONVIA",
      "location": "Escuintla · Pacific corridor",
      "amount_usd_millions": 154,
      "amount_display": "US$154 M",
      "amount_basis": "Reported investment · existing contract",
      "amount_source_date": "Sep. 2026",
      "source_amount": 154,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Construction suppliers and subcontractors; operations and maintenance preparation.",
      "next_step": "Read the ANI project page and confirm purchasing procedures and supplier requirements with the concessionaire.",
      "url": "https://guatemalainfrastructure.org/projects/epq/en/",
      "sources": [
        {
          "id": "S30",
          "url": "https://anadie.gob.gt/project/autopista-escuintla-puerto-quetzal/",
          "publisher": "ANI",
          "date": null,
          "title": "ANI: current Escuintla–Puerto Quetzal profile"
        }
      ]
    },
    {
      "id": "vas",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Contratación privada / private procurement · permisos por proyecto / project-specific permits",
      "legal_basis_status": "permits-not-fully-verified",
      "legal_pathways": [
        "privado"
      ],
      "legal_source_urls": [
        "https://www.vasguatemala.com/noticias",
        "https://www.prensalibre.com/economia/vas-cumple-10-anos-y-anuncia-dos-nuevas-opciones-para-los-usuarios-incluida-una-para-facilitar-el-pago/"
      ],
      "name": "VAS · Southern Alternative Road",
      "summary": "Operating private road network; a reference for road development and management.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Private",
      "mechanism_key": "Privado",
      "funding_source": null,
      "stage": "Operating",
      "stage_key": "En operación",
      "owner": "VAS private operator",
      "location": "Southern metropolitan area",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "No comparable CAPEX verified",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "operation",
      "participation_guidance": "Toll technology, maintenance and user services.",
      "next_step": "Review operator updates and ask about private supplier processes for operating services or announced expansions.",
      "url": "https://guatemalainfrastructure.org/projects/vas/en/",
      "sources": [
        {
          "id": "S15",
          "url": "https://www.vasguatemala.com/noticias",
          "publisher": "VAS",
          "date": null,
          "title": "VAS: operating private road network"
        },
        {
          "id": "S16",
          "url": "https://www.prensalibre.com/economia/vas-cumple-10-anos-y-anuncia-dos-nuevas-opciones-para-los-usuarios-incluida-una-para-facilitar-el-pago/",
          "publisher": "Prensa Libre",
          "date": "2026-08-27",
          "title": "VAS: ten years and three sections"
        }
      ]
    },
    {
      "id": "xochi",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Contratación privada / private procurement · permisos por proyecto / project-specific permits",
      "legal_basis_status": "permits-not-fully-verified",
      "legal_pathways": [
        "privado"
      ],
      "legal_source_urls": [
        "https://www.prensalibre.com/guatemala/xochi-abre-oficialmente-y-activa-nueva-conexion-estrategica-en-la-costa-sur/"
      ],
      "name": "Xochi · Corredor de las Flores",
      "summary": "First phase opened to the public in June 2026.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Private",
      "mechanism_key": "Privado",
      "funding_source": null,
      "stage": "Operating",
      "stage_key": "En operación",
      "owner": "Xochi private developer and operator",
      "location": "Suchitepéquez · Retalhuleu",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "No comparable CAPEX verified",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "operation",
      "participation_guidance": "Road operations, electronic tolling, maintenance and logistics services.",
      "next_step": "Contact the operator about supplier requirements and potential cooperation linked to operations.",
      "url": "https://guatemalainfrastructure.org/projects/xochi/en/",
      "sources": [
        {
          "id": "S17",
          "url": "https://www.prensalibre.com/guatemala/xochi-abre-oficialmente-y-activa-nueva-conexion-estrategica-en-la-costa-sur/",
          "publisher": "Prensa Libre",
          "date": "2026-06-14",
          "title": "Xochi: opening to the public"
        }
      ]
    },
    {
      "id": "verde",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Contratación privada / private procurement · permisos por proyecto / project-specific permits",
      "legal_basis_status": "permits-not-fully-verified",
      "legal_pathways": [
        "privado"
      ],
      "legal_source_urls": [
        "https://lahora.gt/nacionales/hloarca/2026/07/05/de-san-cristobal-a-zona-11-en-15-minutos-avanza-construccion-de-nueva-ruta-con-paso-subterraneo/"
      ],
      "name": "Corredor Verde",
      "summary": "Private connection between San Cristóbal and the Periférico; construction reported.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Private",
      "mechanism_key": "Privado",
      "funding_source": null,
      "stage": "Construction reported",
      "stage_key": "Construcción reportada",
      "owner": "Corredor Verde, S.A. · applicable municipal permits",
      "location": "Mixco · Guatemala City zone 11",
      "amount_usd_millions": 65.33547807929375,
      "amount_display": "≈ US$65.3 M",
      "amount_basis": "Announced minimum · approximate USD equivalent",
      "amount_source_date": "Jul. 2026",
      "source_amount": 500,
      "source_currency": "GTQ",
      "converted_to_usd": true,
      "participation_status": "delivery",
      "participation_guidance": "Civil engineering, structures, drainage and construction supplies.",
      "next_step": "Ask the promoter about work scope and private procurement procedures before offering supplies or services.",
      "url": "https://guatemalainfrastructure.org/projects/verde/en/",
      "sources": [
        {
          "id": "S18",
          "url": "https://lahora.gt/nacionales/hloarca/2026/07/05/de-san-cristobal-a-zona-11-en-15-minutos-avanza-construccion-de-nueva-ruta-con-paso-subterraneo/",
          "publisher": "La Hora",
          "date": "2026-07-05",
          "title": "Corredor Verde: construction and announced investment"
        }
      ]
    },
    {
      "id": "aero",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "12-2002 · arts. 73–76 + 57-92 · art. 96 · DAJ-003-2021",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "municipal"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/assets/uploads/info_legislativo/diario_de_sesiones/d3731-diario-final-so_076_24-11-2021.pdf"
      ],
      "name": "AeroMetro · municipal concession",
      "summary": "Cable transport concession; construction and financial close reported.",
      "sector": "Mobility",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "Municipal concession",
      "mechanism_key": "Concesión municipal",
      "funding_source": null,
      "stage": "Construction reported",
      "stage_key": "Construcción reportada",
      "owner": "Guatemala Municipality · Cablevía and concession group; coordination with Mixco",
      "location": "Guatemala · Mixco",
      "amount_usd_millions": 220,
      "amount_display": "US$220 M",
      "amount_basis": "Developer’s published estimate",
      "amount_source_date": "Página consultada nov. 2026",
      "source_amount": 220,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Electromechanical systems, stations, urban integration and operations training.",
      "next_step": "Ask the concessionaire about delivery stages and supplier-chain requirements.",
      "url": "https://guatemalainfrastructure.org/projects/aero/en/",
      "sources": [
        {
          "id": "S12",
          "url": "https://www.aerometro.gt/",
          "publisher": "Cablevía / AeroMetro",
          "date": null,
          "title": "AeroMetro: project developer"
        },
        {
          "id": "S13",
          "url": "https://www.deloitte.com/latam/es/services/financial-advisory/perspectives/deloitte-trusted-advisor-aerometro-guatemala.html",
          "publisher": "Deloitte",
          "date": "2026",
          "title": "AeroMetro: financial close"
        },
        {
          "id": "S14",
          "url": "https://lahora.gt/lh-economia/hloarca/2026/02/05/del-trebol-a-la-zona-9-sin-trafico-la-constructora-del-aerometro-promete-conectar-estos-puntos-en-18-meses/",
          "publisher": "La Hora",
          "date": "2026-02-05",
          "title": "AeroMetro: construction and concession model"
        },
        {
          "id": "S23",
          "url": "https://www.congreso.gob.gt/assets/uploads/info_legislativo/diario_de_sesiones/d3731-diario-final-so_076_24-11-2021.pdf",
          "publisher": "Congreso de la República",
          "date": "2021-11-24",
          "title": "AeroMetro: legislative concession record"
        }
      ]
    },
    {
      "id": "uk",
      "portfolio_class": "metroriel-special-regime",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "24-2026 · arts. 2–4 · MetroRiel / FEGUA",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "g2g"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/noticias_congreso/17465/2026/4"
      ],
      "name": "Metro Riel · Guatemala–UK cooperation",
      "summary": "Agreement signed in July 2026 to support project preparation and planning.",
      "sector": "Mobility",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "Government-to-government cooperation (G2G)",
      "mechanism_key": "G2G",
      "funding_source": null,
      "stage": "Early preparation",
      "stage_key": "Preparación temprana",
      "owner": "FEGUA · implementing entity, Decree 24-2026 art. 3",
      "location": "Guatemala metropolitan area",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "No current CAPEX validated for this cooperation",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "cooperation",
      "participation_guidance": "Rail studies, urban integration and academic cooperation.",
      "next_step": "Review the cooperation framework and confirm the implementing body, scope and published procedures before preparing a bid.",
      "url": "https://guatemalainfrastructure.org/projects/uk/en/",
      "sources": [
        {
          "id": "S10",
          "url": "https://www.gov.uk/government/news/guatemala-chooses-uk-as-partner-for-metro-riel",
          "publisher": "British Embassy · GOV.UK",
          "date": "2026-07-14",
          "title": "Guatemala chooses UK as Metro Riel partner"
        },
        {
          "id": "S11",
          "url": "https://agn.gt/que-dice-el-memorando-firmado-entre-guatemala-y-el-reino-unido-sobre-el-proyecto-metrorriel",
          "publisher": "AGN",
          "date": "2026-07-17",
          "title": "Scope of Guatemala–UK memorandum"
        },
        {
          "id": "S32",
          "url": "https://guatemala.gob.gt/presidente-bernardo-arevalo-presenta-resultados-de-fase-0-y-hoja-de-ruta-del-proyecto-metroriel/",
          "publisher": "Secretaría de Comunicación Social · Gobierno de Guatemala",
          "date": "2026-10-30",
          "title": "Metro Riel: Phase 0 results and roadmap"
        }
      ]
    },
    {
      "id": "us-port",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Convenio G2G / G2G agreement · 3-2026 art. 42: alcance por verificar / applicability to verify",
      "legal_basis_status": "agreement-scope-pending",
      "legal_pathways": [
        "g2g"
      ],
      "legal_source_urls": [
        "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
        "https://gae.gob.gt/wp-content/uploads/2026/04/Decreto-3-2026.pdf"
      ],
      "name": "Puerto Quetzal · USACE cooperation",
      "summary": "Cooperation on port modernisation and rail connection studies.",
      "sector": "Ports and logistics",
      "sector_key": "Puertos y logística",
      "sector_slug": "ports-logistics",
      "mechanism": "Government-to-government cooperation (G2G)",
      "mechanism_key": "G2G",
      "funding_source": null,
      "stage": "Early preparation",
      "stage_key": "Preparación temprana",
      "owner": "Mindef · CIV · USACE; port coordination with EPQ to be specified in the instruments",
      "location": "Puerto Quetzal · Escuintla",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "No component-level CAPEX validated",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "cooperation",
      "participation_guidance": "Port engineering, maritime studies and technical training.",
      "next_step": "Ask EPQ about the public scope of cooperation and confirm which institution handles each study or procurement.",
      "url": "https://guatemalainfrastructure.org/projects/us-port/en/",
      "sources": [
        {
          "id": "S08",
          "url": "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
          "publisher": "AGN",
          "date": "2026-01-15",
          "title": "USACE cooperation: letters of acceptance"
        }
      ]
    },
    {
      "id": "us-road",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Convenio G2G / G2G agreement · 3-2026 art. 42: alcance por verificar / applicability to verify",
      "legal_basis_status": "agreement-scope-pending",
      "legal_pathways": [
        "g2g"
      ],
      "legal_source_urls": [
        "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
        "https://gae.gob.gt/wp-content/uploads/2026/04/Decreto-3-2026.pdf"
      ],
      "name": "Road programme · USACE cooperation",
      "summary": "Six announced interventions; current progress and packages require confirmation.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Government-to-government cooperation (G2G)",
      "mechanism_key": "G2G",
      "funding_source": null,
      "stage": "Early preparation",
      "stage_key": "Preparación temprana",
      "owner": "Mindef · CIV · USACE",
      "location": "Several departments",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "Cooperation funding not treated as project-level CAPEX",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "cooperation",
      "participation_guidance": "Road studies, interchange engineering and technical assistance.",
      "next_step": "Ask CIV for public information on components, studies and the procuring entity; follow published procedures.",
      "url": "https://guatemalainfrastructure.org/projects/us-road/en/",
      "sources": [
        {
          "id": "S08",
          "url": "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
          "publisher": "AGN",
          "date": "2026-01-15",
          "title": "USACE cooperation: letters of acceptance"
        },
        {
          "id": "S09",
          "url": "https://agn.gt/cuerpo-de-ingenieros-del-ejercito-de-estados-unidos-ya-se-organiza-para-la-construccion-de-proyectos-viales-prioritarios-en-guatemala/",
          "publisher": "AGN",
          "date": "2026-05-25",
          "title": "USACE: six announced road interventions"
        }
      ]
    },
    {
      "id": "ca9-teculutan-mayuelas",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "24-2025 · 6027/OC-GU · cláusulas 4.03–4.05 · BID",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "multilateral"
      ],
      "legal_source_urls": [
        "https://www.iadb.org/es/proyecto/GU-L1189",
        "https://guatemalainfrastructure.org/laws/loan-6027-oc-gu-original.pdf"
      ],
      "name": "CA-9 North · Teculután–Mayuelas",
      "summary": "Four-lane widening in Zacapa to improve access to the Atlantic ports and resilience to flooding.",
      "sector": "Roads",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Public works with multilateral financing",
      "mechanism_key": "Obra pública con financiamiento multilateral",
      "funding_source": "IDB sovereign loan",
      "stage": "En contratación",
      "stage_key": "En contratación",
      "owner": "CIV · DGC · UCP",
      "location": "Teculután · Río Hondo · Gualán (Mayuelas), Zacapa",
      "amount_usd_millions": 350,
      "amount_display": "US$350 M",
      "amount_basis": "Approved financing for the entire programme",
      "amount_source_date": "2025-07-23",
      "source_amount": 350,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "procurement",
      "participation_guidance": "Engineering firms experienced in road construction supervision.",
      "next_step": "Check notice 39755 and its amendments for requirements, submission time and delivery instructions.",
      "url": "https://guatemalainfrastructure.org/projects/ca9-teculutan-mayuelas/en/",
      "sources": [
        {
          "id": "S33",
          "url": "https://www.iadb.org/es/proyecto/GU-L1189",
          "publisher": "BID",
          "date": "2025-07-23",
          "title": "IDB · programme GU-L1189"
        },
        {
          "id": "S34",
          "url": "https://data.iadb.org/es/api/action/datastore_search?resource_id=856aabfd-2c6a-48fb-a8b8-19f3ff443618&q=39755",
          "publisher": "BID",
          "date": "2026-11-19",
          "title": "IDB · notice record 39755"
        },
        {
          "id": "S35",
          "url": "https://www.congreso.gob.gt/detalle_pdf/decretos/13687",
          "publisher": "Congreso de la República",
          "date": "2025-12-15",
          "title": "Congress · Approval Decree 24-2025"
        },
        {
          "id": "S36",
          "url": "https://www.iadb.org/idb-pdf-proxy/EZIDB0000366-2056220512-10172",
          "publisher": "BID",
          "date": "2026-01-21",
          "title": "IDB · Loan agreement 6027/OC-GU"
        },
        {
          "id": "S37",
          "url": "https://www.congreso.gob.gt/noticias_congreso/15038/2026/4",
          "publisher": "Congreso de la República",
          "date": null,
          "title": "Congress · CA-9 territorial coverage"
        }
      ]
    },
    {
      "id": "onu-estadio",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "17-2000 · Acuerdo Básico PNUD · CDAG/PNUD 01005569 · POPP",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.undp.org/es/guatemala/comunicados-de-prensa/unidos-por-el-deporte-cdag-y-pnud-en-guatemala-firman-convenio-para-fortalecer-el-deporte-nacional-como-catalizador",
        "https://www.ungm.org/Public/Notice/316749",
        "https://www.ungm.org/Public/Notice/320250"
      ],
      "name": "Doroteo Guamuch Flores stadium upgrades",
      "summary": "Sports infrastructure upgrades under CDAG–UNDP cooperation. Supervision deadline: 3 December 2026; works bidding closed 19 November.",
      "sector": "Public buildings",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "United Nations system",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "En contratación",
      "stage_key": "En contratación",
      "owner": "CDAG · PNUD",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "procurement",
      "participation_guidance": "Construction, supervision, engineering and services by package.",
      "next_step": "Check the official notice, amendments and awards. Expired deadlines do not accept bids; confirm the next stage with the agency.",
      "url": "https://guatemalainfrastructure.org/projects/onu-estadio/en/",
      "sources": [
        {
          "id": "UN-onu-estadio-0",
          "url": "https://www.undp.org/es/guatemala/comunicados-de-prensa/unidos-por-el-deporte-cdag-y-pnud-en-guatemala-firman-convenio-para-fortalecer-el-deporte-nacional-como-catalizador",
          "publisher": "PNUD",
          "date": null,
          "title": "Doroteo Guamuch Flores stadium upgrades"
        },
        {
          "id": "UN-onu-estadio-1",
          "url": "https://www.ungm.org/Public/Notice/316749",
          "publisher": "UNGM",
          "date": null,
          "title": "Doroteo Guamuch Flores stadium upgrades"
        },
        {
          "id": "UN-onu-estadio-2",
          "url": "https://www.ungm.org/Public/Notice/320250",
          "publisher": "UNGM",
          "date": null,
          "title": "Doroteo Guamuch Flores stadium upgrades"
        }
      ]
    },
    {
      "id": "onu-igss-zona5",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "IGSS / UNOPS · INFRAIGSS · RFP/2026/63797",
      "legal_basis_status": "agreement-basis-pending",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.ungm.org/Public/Notice/309929",
        "https://www.unops.org/es/news-and-stories/news/strengthening-igss-hospital-network-in-guatemala",
        "https://proyectosguatemala.org/infraigss"
      ],
      "name": "IGSS Zone 5 General Hospital",
      "summary": "INFRAIGSS hospital infrastructure. Construction bidding closed 1 October 2026; award and construction start remain unverified.",
      "sector": "Public buildings",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "United Nations system",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Stage to be confirmed",
      "stage_key": "Etapa por confirmar",
      "owner": "IGSS · UNOPS · INFRAIGSS",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Construction, supervision, engineering and services by package.",
      "next_step": "Check the official notice, amendments and awards. Expired deadlines do not accept bids; confirm the next stage with the agency.",
      "url": "https://guatemalainfrastructure.org/projects/onu-igss-zona5/en/",
      "sources": [
        {
          "id": "UN-onu-igss-zona5-0",
          "url": "https://www.ungm.org/Public/Notice/309929",
          "publisher": "UNGM",
          "date": "2026-08-06",
          "title": "IGSS Zone 5 General Hospital"
        },
        {
          "id": "UN-onu-igss-zona5-1",
          "url": "https://www.unops.org/es/news-and-stories/news/strengthening-igss-hospital-network-in-guatemala",
          "publisher": "UNOPS",
          "date": null,
          "title": "IGSS Zone 5 General Hospital"
        },
        {
          "id": "UN-onu-igss-zona5-2",
          "url": "https://proyectosguatemala.org/infraigss",
          "publisher": "PNUD",
          "date": null,
          "title": "IGSS Zone 5 General Hospital"
        }
      ]
    },
    {
      "id": "onu-igss-zacapa",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "IGSS / UNOPS · INFRAIGSS · RFP/2025/58992",
      "legal_basis_status": "agreement-basis-pending",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.ungm.org/Public/ContractAward/156640",
        "https://www.ungm.org/Public/ContractAward/156638",
        "https://www.ungm.org/Public/Notice/280228"
      ],
      "name": "Eastern Regional Hospital · IGSS Zacapa",
      "summary": "Hospital works awarded according to UNGM on 24 November 2026. An award alone does not establish construction start or physical progress.",
      "sector": "Public buildings",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "United Nations system",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Adjudicado",
      "stage_key": "Adjudicado",
      "owner": "IGSS · UNOPS · INFRAIGSS",
      "location": "Zacapa · Zacapa",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Construction, supervision, engineering and services by package.",
      "next_step": "Check the official notice, amendments and awards. Expired deadlines do not accept bids; confirm the next stage with the agency.",
      "url": "https://guatemalainfrastructure.org/projects/onu-igss-zacapa/en/",
      "sources": [
        {
          "id": "UN-onu-igss-zacapa-0",
          "url": "https://www.ungm.org/Public/ContractAward/156640",
          "publisher": "UNGM",
          "date": "2026-11-24",
          "title": "Eastern Regional Hospital · IGSS Zacapa"
        },
        {
          "id": "UN-onu-igss-zacapa-1",
          "url": "https://www.ungm.org/Public/ContractAward/156638",
          "publisher": "UNGM",
          "date": null,
          "title": "Eastern Regional Hospital · IGSS Zacapa"
        },
        {
          "id": "UN-onu-igss-zacapa-2",
          "url": "https://www.ungm.org/Public/Notice/280228",
          "publisher": "UNGM",
          "date": null,
          "title": "Eastern Regional Hospital · IGSS Zacapa"
        }
      ]
    },
    {
      "id": "onu-semaforos",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "PNUD / MuniJoven · 36-2024 art.105(c) / 3-2026 art.17",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.undp.org/es/guatemala/noticias/en-el-marco-del-proyecto-munijoven-la-municipalidad-de-guatemala-y-el-pnud-en-guatemala-continuan-cooperacion-en-la-implementacion",
        "https://muniguatealfrente.com/la-red-de-semaforos-conectados-alcanza-el-90-de-avance/",
        "https://dca.gob.gt/noticias-guatemala-diario-centro-america/muni-instala-220-aparatos-inteligentes/"
      ],
      "name": "Smart traffic signals · Guatemala City",
      "summary": "Municipal implementation with UNDP/MuniJoven. The municipality reports 459 of 511 junctions operating on 23 November 2026; no new open call verified.",
      "sector": "Mobility",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "United Nations system",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Implementation reported",
      "stage_key": "Ejecución reportada",
      "owner": "Municipalidad de Guatemala · PNUD/MuniJoven",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Construction, supervision, engineering and services by package.",
      "next_step": "Check the official notice, amendments and awards. Expired deadlines do not accept bids; confirm the next stage with the agency.",
      "url": "https://guatemalainfrastructure.org/projects/onu-semaforos/en/",
      "sources": [
        {
          "id": "UN-onu-semaforos-0",
          "url": "https://www.undp.org/es/guatemala/noticias/en-el-marco-del-proyecto-munijoven-la-municipalidad-de-guatemala-y-el-pnud-en-guatemala-continuan-cooperacion-en-la-implementacion",
          "publisher": "PNUD",
          "date": "2026-11-23",
          "title": "Smart traffic signals · Guatemala City"
        },
        {
          "id": "UN-onu-semaforos-1",
          "url": "https://muniguatealfrente.com/la-red-de-semaforos-conectados-alcanza-el-90-de-avance/",
          "publisher": "Municipalidad de Guatemala",
          "date": null,
          "title": "Smart traffic signals · Guatemala City"
        },
        {
          "id": "UN-onu-semaforos-2",
          "url": "https://dca.gob.gt/noticias-guatemala-diario-centro-america/muni-instala-220-aparatos-inteligentes/",
          "publisher": "PNUD",
          "date": null,
          "title": "Smart traffic signals · Guatemala City"
        }
      ]
    },
    {
      "id": "onu-pachalum-preinversion",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "MARN / PNUD / GEF · Motagua 92858 · CI92858-006-2026",
      "legal_basis_status": "agreement-basis-pending",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
        "https://www.undp.org/es/guatemala/proyectos/gestion-ambiental-integral-de-la-cuenca-del-rio-motagua",
        "https://marn.gob.gt/wp-content/uploads/2026/11/Proceso-CI-92858-012-2026-TdR-Facilitacion-Mesas-Panel-Motagua-publicacion.pdf"
      ],
      "name": "Waste infrastructure preparation · Pachalum",
      "summary": "Prefeasibility study within the MARN–UNDP–GEF Motagua programme, running through December 2026. Study outcome and works procurement remain unverified.",
      "sector": "Sanitation",
      "sector_key": "Saneamiento",
      "sector_slug": "water-waste",
      "mechanism": "United Nations system",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Early preparation",
      "stage_key": "Preparación temprana",
      "owner": "MARN · PNUD · GEF · Proyecto Motagua92858",
      "location": "Pachalum · Quiché",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Construction, supervision, engineering and services by package.",
      "next_step": "Check the official notice, amendments and awards. Expired deadlines do not accept bids; confirm the next stage with the agency.",
      "url": "https://guatemalainfrastructure.org/projects/onu-pachalum-preinversion/en/",
      "sources": [
        {
          "id": "UN-onu-pachalum-preinversion-0",
          "url": "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
          "publisher": "MARN",
          "date": null,
          "title": "Waste infrastructure preparation · Pachalum"
        },
        {
          "id": "UN-onu-pachalum-preinversion-1",
          "url": "https://www.undp.org/es/guatemala/proyectos/gestion-ambiental-integral-de-la-cuenca-del-rio-motagua",
          "publisher": "PNUD",
          "date": null,
          "title": "Waste infrastructure preparation · Pachalum"
        },
        {
          "id": "UN-onu-pachalum-preinversion-2",
          "url": "https://marn.gob.gt/wp-content/uploads/2026/11/Proceso-CI-92858-012-2026-TdR-Facilitacion-Mesas-Panel-Motagua-publicacion.pdf",
          "publisher": "MARN",
          "date": null,
          "title": "Waste infrastructure preparation · Pachalum"
        }
      ]
    },
    {
      "id": "onu-comedores",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "MIDES / PNUD 01002876 · 36-2024 art.105(b) / 3-2026 art.17",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.ungm.org/Public/Notice/315032",
        "https://www.ungm.org/Public/Notice/312137",
        "https://www.mides.gob.gt/images/uip/ipublica/29/ApoyoMIDES-PNUD-2024.pdf"
      ],
      "name": "FEGUA and Roosevelt social dining facilities rehabilitation",
      "summary": "Water, sanitation, ventilation and electrical rehabilitation under MIDES–UNDP project 01002876. Calls closed; award and physical execution unverified. Two facilities in one profile.",
      "sector": "Public buildings",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "United Nations system",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Stage to be confirmed",
      "stage_key": "Etapa por confirmar",
      "owner": "MIDES · PNUD · Proyecto01002876",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "To be confirmed",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Construction, supervision, engineering and services by package.",
      "next_step": "Check the official notice, amendments and awards. Expired deadlines do not accept bids; confirm the next stage with the agency.",
      "url": "https://guatemalainfrastructure.org/projects/onu-comedores/en/",
      "sources": [
        {
          "id": "UN-onu-comedores-0",
          "url": "https://www.ungm.org/Public/Notice/315032",
          "publisher": "UNGM",
          "date": "2026-09-21",
          "title": "FEGUA and Roosevelt social dining facilities rehabilitation"
        },
        {
          "id": "UN-onu-comedores-1",
          "url": "https://www.ungm.org/Public/Notice/312137",
          "publisher": "UNGM",
          "date": null,
          "title": "FEGUA and Roosevelt social dining facilities rehabilitation"
        },
        {
          "id": "UN-onu-comedores-2",
          "url": "https://www.mides.gob.gt/images/uip/ipublica/29/ApoyoMIDES-PNUD-2024.pdf",
          "publisher": "MIDES",
          "date": null,
          "title": "FEGUA and Roosevelt social dining facilities rehabilitation"
        }
      ]
    }
  ]
}