  "schema_version": "1.0",
  "language": "fr",
  "content_revision": "2026-11-27",
  "verification_note": "A content revision is not a new verification of every source. See source dates and procurement review dates.",
  "project_count": 25,
  "amount_unit": "USD millions",
  "fx": {
    "gtqPerUsd": 7.65281,
    "date": "2026-11-27",
    "source": "https://www.banguat.gob.gt/tipo_cambio/"
  },
  "procurement_review_date": "2026-11-25",
  "notices": [
    {
      "id": "idb-39755",
      "projectIds": [
        "ca9-teculutan-mayuelas"
      ],
      "status": "eoi",
      "title": [
        "Supervisión de la ampliación a cuatro carriles.",
        "Supervision of the four-lane widening works.",
        "Supervision des travaux de mise à quatre voies.",
        "4차로 확장 공사 감리.",
        "4車線への拡幅工事の施工監理。"
      ],
      "summary": [
        "Firmas de ingeniería con experiencia en supervisión vial.",
        "Engineering firms experienced in road construction supervision.",
        "Bureaux d’ingénierie expérimentés en supervision de travaux routiers.",
        "도로 공사 감리 경험이 있는 엔지니어링 회사.",
        "道路工事の施工監理経験があるエンジニアリング会社。"
      ],
      "buyer": "CIV",
      "noticeId": "39755",
      "publicationDate": "2026-11-19",
      "deadline": "2027-01-29T15:00:00-06:00",
      "nog": "32817096",
      "verifiedAt": "2026-11-24",
      "url": "https://www.iadb.org/idb-pdf-proxy/EZIDB0000271-2062991416-20",
      "recordUrl": "https://data.iadb.org/es/api/action/datastore_search?resource_id=856aabfd-2c6a-48fb-a8b8-19f3ff443618&q=39755"
    },
    {
      "id": "UNDP-GTM-00294",
      "noticeId": "UNDP-GTM-00294",
      "projectIds": [
        "onu-estadio"
      ],
      "title": [
        "Obras de mejoramiento del estadio",
        "Stadium improvement works",
        "Travaux de modernisation du stade",
        "경기장 개선 공사",
        "競技場改修工事"
      ],
      "summary": [
        "Contratación de las obras. Este aviso corresponde al mismo estadio que el proceso de supervisión UNDP-GTM-00300; son contratos distintos de un único proyecto.",
        "Procurement of construction works. This notice concerns the same stadium as supervision process UNDP-GTM-00300: separate contracts within one project.",
        "Marché de travaux. Même stade que la supervision UNDP-GTM-00300 : deux contrats pour un seul projet.",
        "공사 계약입니다. 감리 절차 UNDP-GTM-00300과 같은 경기장 사업에 속하며 별도 사업이 아닙니다.",
        "工事の調達です。監理手続UNDP-GTM-00300と同じ競技場事業に属する別契約です。"
      ],
      "buyer": "CDAG · PNUD",
      "publicationDate": "2026-10-03",
      "deadline": "2026-11-19T18:00:00-04:00",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/316749",
      "sourceUrl": "https://www.ungm.org/Public/Notice/316749",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "UNDP-GTM-00300",
      "noticeId": "UNDP-GTM-00300",
      "projectIds": [
        "onu-estadio"
      ],
      "title": [
        "Supervisión de las obras del estadio",
        "Supervision of stadium works",
        "Supervision des travaux du stade",
        "경기장 공사 감리",
        "競技場工事の監理"
      ],
      "summary": [
        "Contratación del servicio de supervisión de las obras, separado del contrato de construcción UNDP-GTM-00294. Ambos procesos pertenecen a un único proyecto de mejoramiento del estadio.",
        "Procurement of works supervision services, separate from construction contract UNDP-GTM-00294. Both processes belong to one stadium improvement project.",
        "Services de supervision, distincts du marché de travaux UNDP-GTM-00294. Les deux procédures concernent un seul projet de modernisation du stade.",
        "공사 계약 UNDP-GTM-00294와 별도로 발주되는 감리 용역입니다. 두 절차는 하나의 경기장 개선 사업에 속합니다.",
        "工事契約UNDP-GTM-00294とは別の監理業務の調達です。両手続は1件の競技場改修事業に属します。"
      ],
      "buyer": "CDAG · PNUD",
      "publicationDate": "2026-10-29",
      "deadline": "2026-12-03T18:00:00-04:00",
      "status": "open",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/320250",
      "sourceUrl": "https://www.ungm.org/Public/Notice/320250",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "RFP/2026/63797",
      "noticeId": "RFP/2026/63797",
      "projectIds": [
        "onu-igss-zona5"
      ],
      "title": [
        "Hospital General IGSS Zona 5",
        "IGSS Zone 5 General Hospital",
        "Hôpital général IGSS zone 5",
        "IGSS 5구역 종합병원",
        "IGSS第5区総合病院"
      ],
      "summary": [
        "Infraestructura hospitalaria de INFRAIGSS. La licitación de construcción cerró el 1 de octubre de 2026; adjudicación e inicio de obra por confirmar.",
        "INFRAIGSS hospital infrastructure. Construction bidding closed 1 October 2026; award and construction start remain unverified.",
        "Infrastructure hospitalière INFRAIGSS. Appel clos le 1er octobre 2026 ; attribution et démarrage à confirmer.",
        "INFRAIGSS 병원 인프라. 공사 입찰은 2026년 10월 1일 마감됐으며 낙찰·착공은 미확인입니다.",
        "INFRAIGSS病院施設。工事入札は2026年10月1日に終了。落札と着工は未確認です。"
      ],
      "buyer": "IGSS · UNOPS · INFRAIGSS",
      "publicationDate": "2026-08-06",
      "deadline": "2026-10-01T23:00:00Z",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/309929",
      "sourceUrl": "https://www.ungm.org/Public/Notice/309929",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "CI92858-006-2026",
      "noticeId": "CI92858-006-2026",
      "projectIds": [
        "onu-pachalum-preinversion"
      ],
      "title": [
        "Preinversión de residuos · Pachalum",
        "Waste infrastructure preparation · Pachalum",
        "Préinvestissement déchets · Pachalum",
        "폐기물 인프라 사전투자 · Pachalum",
        "廃棄物施設の事前投資・Pachalum"
      ],
      "summary": [
        "Estudio de prefactibilidad dentro del Proyecto Motagua MARN–PNUD–GEF, cuyo programa está en curso hasta diciembre de 2026. Resultado del estudio y contratación de obra no verificados.",
        "Prefeasibility study within the MARN–UNDP–GEF Motagua programme, running through December 2026. Study outcome and works procurement remain unverified.",
        "Étude de préfaisabilité du programme Motagua MARN–PNUD–GEF, en cours jusqu’en décembre 2026. Résultat de l’étude et marché de travaux non vérifiés.",
        "2026년 12월까지 진행되는 MARN–UNDP–GEF Motagua 프로그램의 사전타당성 조사입니다. 조사 결과와 공사 계약은 미확인입니다.",
        "2026年12月まで継続するMARN–UNDP–GEF Motagua事業内の予備調査。調査結果と工事調達は未確認です。"
      ],
      "buyer": "MARN · PNUD · GEF · Proyecto Motagua92858",
      "publicationDate": null,
      "deadline": "2026-02-19T13:00:00-06:00",
      "status": "closed",
      "verifiedAt": "2026-11-25",
      "verified": "2026-11-25",
      "lastVerified": "2026-11-25",
      "url": "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
      "sourceUrl": "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "UNDP-GTM-00292",
      "noticeId": "UNDP-GTM-00292",
      "projectIds": [
        "onu-comedores"
      ],
      "title": [
        "Comedores: obras hidrosanitarias, remozamiento y ventilación",
        "Dining facilities: plumbing, refurbishment and ventilation",
        "Cantines : plomberie, rénovation et ventilation",
        "급식시설: 급배수·개보수·환기 공사",
        "食堂：給排水・改修・換気工事"
      ],
      "summary": [
        "Paquete para los comedores FEGUA y Roosevelt. Las instalaciones eléctricas se contrataron mediante otro aviso del mismo proyecto agrupado.",
        "Package for the FEGUA and Roosevelt dining facilities. Electrical installations are covered by a separate notice within the same grouped project.",
        "Lot pour les cantines FEGUA et Roosevelt. Les installations électriques relèvent d’un autre avis du même projet regroupé.",
        "FEGUA·Roosevelt 급식시설 공사입니다. 전기설비는 같은 통합 사업의 별도 공고에 해당합니다.",
        "FEGUA・Roosevelt食堂向けの工事です。電気設備は同じ統合事業の別公告です。"
      ],
      "buyer": "MIDES · PNUD · Proyecto01002876",
      "publicationDate": "2026-09-21",
      "deadline": "2026-10-19T19:00:00-04:00",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/315032",
      "sourceUrl": "https://www.ungm.org/Public/Notice/315032",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    },
    {
      "id": "UNDP-GTM-00286",
      "noticeId": "UNDP-GTM-00286",
      "projectIds": [
        "onu-comedores"
      ],
      "title": [
        "Comedores: instalaciones eléctricas",
        "Dining facilities: electrical installations",
        "Cantines : installations électriques",
        "급식시설: 전기설비",
        "食堂：電気設備"
      ],
      "summary": [
        "Paquete eléctrico para los comedores FEGUA y Roosevelt. Es un contrato diferente al paquete hidrosanitario, de remozamiento y ventilación; no constituye otro proyecto.",
        "Electrical package for the FEGUA and Roosevelt dining facilities. A separate contract from plumbing, refurbishment and ventilation, not an additional project.",
        "Lot électrique des cantines FEGUA et Roosevelt. Contrat distinct du lot plomberie, rénovation et ventilation ; aucun projet supplémentaire.",
        "FEGUA·Roosevelt 급식시설 전기설비 계약입니다. 급배수·개보수·환기 계약과 구분되지만 별도 사업은 아닙니다.",
        "FEGUA・Roosevelt食堂の電気設備契約です。給排水・改修・換気とは別契約ですが、別事業ではありません。"
      ],
      "buyer": "MIDES · PNUD · Proyecto01002876",
      "publicationDate": "2026-08-24",
      "deadline": "2026-09-14T12:00:00-04:00",
      "status": "closed",
      "verifiedAt": "2026-11-27",
      "verified": "2026-11-27",
      "lastVerified": "2026-11-27",
      "url": "https://www.ungm.org/Public/Notice/312137",
      "sourceUrl": "https://www.ungm.org/Public/Notice/312137",
      "source": "UNGM / entidad ejecutora",
      "method": "Agency procurement",
      "amount": null
    }
  ],
  "projects": [
    {
      "id": "ani-01",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Radial 6 · Connexion CA-1 Ouest–CA-9 Sud",
      "summary": "Connexion CA-1 Ouest–CA-9 Sud. La fiche officielle ANI est la référence de périmètre et de coût.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · Municipalité de Guatemala",
      "location": "Aire métropolitaine · Sacatepéquez",
      "amount_usd_millions": 158,
      "amount_display": "US$158 M",
      "amount_basis": "Fiche officielle ANI · référence retenue",
      "amount_source_date": "Sin fecha publicada · consulta 13 nov. 2026",
      "source_amount": 158,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Études de trafic, ingénierie routière et conseil en structuration.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-01/fr/",
      "sources": [
        {
          "id": "S21",
          "url": "https://anadie.gob.gt/project/ca1-occidente-ca9-sur/",
          "publisher": "ANI",
          "date": null,
          "title": "Radial 6 : fiche institutionnelle"
        },
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-02",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Liaison routière métropolitaine Nord–Est",
      "summary": "Corridor métropolitain identifié pour un éventuel PPP.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Aire métropolitaine de Guatemala",
      "amount_usd_millions": 1227,
      "amount_display": "US$1 227 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 1227,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Planification métropolitaine, modélisation du trafic et conception routière.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-02/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-03",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Pôle d’échanges de transports publics",
      "summary": "Pôle d’échanges inclus dans le portefeuille ANI.",
      "sector": "Mobilité",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Mixco",
      "amount_usd_millions": 38,
      "amount_display": "US$38 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 38,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Conception de terminaux, intégration des transports et études des usagers.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-03/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-04",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Réseau de transport électrique Petén Itzá",
      "summary": "Poste électrique et infrastructures de transport associées à l’étude.",
      "sector": "Énergie",
      "sector_key": "Energía",
      "sector_slug": "energy",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Petén",
      "amount_usd_millions": 200,
      "amount_display": "US$200 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 200,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Ingénierie électrique, études de réseau et analyse environnementale.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-04/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-05",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Réseau de transport électrique San Mateo Ixtatán",
      "summary": "Poste électrique et ligne associée inclus dans les initiatives énergétiques.",
      "sector": "Énergie",
      "sector_key": "Energía",
      "sector_slug": "energy",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Huehuetenango",
      "amount_usd_millions": 13,
      "amount_display": "US$13 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 13,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Études de transport électrique, topographie et aménagement territorial.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-05/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-06",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Réseau régional de transport d’électricité",
      "summary": "Programme régional de postes et de lignes de transport électrique.",
      "sector": "Énergie",
      "sector_key": "Energía",
      "sector_slug": "energy",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Plusieurs départements",
      "amount_usd_millions": 104,
      "amount_display": "US$104 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 104,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Planification des systèmes électriques, modélisation et conseil financier.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-06/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-07",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Gestion des déchets et économie circulaire",
      "summary": "Un programme couvrant quatre territoires, comptabilisé une seule fois.",
      "sector": "Assainissement",
      "sector_key": "Saneamiento",
      "sector_slug": "water-waste",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "MASUR · Sololá · MANCOMUSAC · Gran Ciudad del Sur",
      "amount_usd_millions": 301,
      "amount_display": "US$301 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 301,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Technologies de valorisation, logistique des déchets et recherche appliquée.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-07/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-08",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Modernisation des aérodromes régionaux",
      "summary": "Ensemble d’aérodromes régionaux à l’étude.",
      "sector": "Aéroports",
      "sector_key": "Aeropuertos",
      "sector_slug": "airports",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Quetzaltenango · Puerto Barrios · Huehuetenango",
      "amount_usd_millions": 75,
      "amount_display": "US$75 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 75,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Planification aéroportuaire, ingénierie aéronautique et services spécialisés.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-08/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-09",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Centre de justice pour les affaires de féminicide et de famille",
      "summary": "Bâtiment public spécialisé inclus dans le portefeuille ANI.",
      "sector": "Bâtiments publics",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Ville de Guatemala",
      "amount_usd_millions": 58,
      "amount_display": "US$58 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 58,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Architecture institutionnelle, conception accessible et gestion des installations.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-09/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "ani-10",
      "portfolio_class": "ani-selected-2026",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 / 21-2025 · APP",
      "legal_basis_status": "potential",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/detalle_pdf/decretos/13690"
      ],
      "name": "Infrastructures touristiques de Finca El Jaibal",
      "summary": "Infrastructures touristiques avec transport par câble à l’étude.",
      "sector": "Tourisme",
      "sector_key": "Turismo",
      "sector_slug": "tourism",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "En cours d’évaluation",
      "stage_key": "En evaluación",
      "owner": "ANI · ICE por confirmar",
      "location": "Sololá",
      "amount_usd_millions": 65,
      "amount_display": "US$65 M",
      "amount_basis": "Estimation du portefeuille · non engagée",
      "amount_source_date": "Sep. 2026",
      "source_amount": 65,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Planification touristique, conception paysagère et modèles d’exploitation.",
      "next_step": "Consulter ANI sur le périmètre, les études disponibles et le calendrier de préparation ; identifier la procédure formelle applicable avant de présenter une proposition.",
      "url": "https://guatemalainfrastructure.org/projects/ani-10/fr/",
      "sources": [
        {
          "id": "S01",
          "url": "https://agn.gt/guatemala-cuenta-con-un-nuevo-portafolio-de-10-proyectos-por-medio-de-alianzas-publico-privadas/",
          "publisher": "AGN",
          "date": "2026-08-14",
          "title": "Portefeuille ANI annoncé en août 2026"
        },
        {
          "id": "S02",
          "url": "https://lahora.gt/lh-economia/esmith/2026/08/13/de-392-necesidades-a-10-proyectos-la-ani-presenta-su-nuevo-portafolio-de-infraestructura-publico-privada/",
          "publisher": "La Hora",
          "date": "2026-08-13",
          "title": "Dix projets stratégiques : liste et localisations"
        },
        {
          "id": "S03",
          "url": "https://multimedia.eleconomista.net/epaper/2026/09/63/",
          "publisher": "El Economista · p. 63",
          "date": "2026-09",
          "title": "Portefeuille stratégique : tableau des investissements et modalités"
        },
        {
          "id": "S25",
          "url": "https://www.fundesa.org.gt/en/publications/opinion/ani-lanza-10-proyectos-para-el-desarrollo",
          "publisher": "FUNDESA",
          "date": null,
          "title": "FUNDESA : ANI lance dix projets"
        }
      ]
    },
    {
      "id": "epq",
      "portfolio_class": "ani-contracted",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "16-2010 · contrato APP existente / existing PPP contract",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "app"
      ],
      "legal_source_urls": [
        "https://anadie.gob.gt/project/autopista-escuintla-puerto-quetzal/"
      ],
      "name": "Autoroute Escuintla–Puerto Quetzal",
      "summary": "Contrat PPP approuvé ; projet déjà attribué.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Partenariat public-privé (PPP)",
      "mechanism_key": "APP",
      "funding_source": null,
      "stage": "Construction signalée",
      "stage_key": "Construcción reportada",
      "owner": "CIV · ANI · CONVIA",
      "location": "Escuintla · corridor du Pacifique",
      "amount_usd_millions": 154,
      "amount_display": "US$154 M",
      "amount_basis": "Investissement annoncé · contrat existant",
      "amount_source_date": "Sep. 2026",
      "source_amount": 154,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Fournisseurs et sous-traitants de travaux ; préparation de l’exploitation et de la maintenance.",
      "next_step": "Consulter la fiche ANI et confirmer les procédures d’achat et exigences fournisseurs auprès du concessionnaire.",
      "url": "https://guatemalainfrastructure.org/projects/epq/fr/",
      "sources": [
        {
          "id": "S30",
          "url": "https://anadie.gob.gt/project/autopista-escuintla-puerto-quetzal/",
          "publisher": "ANI",
          "date": null,
          "title": "ANI : fiche actuelle Escuintla–Puerto Quetzal"
        }
      ]
    },
    {
      "id": "vas",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Contratación privada / private procurement · permisos por proyecto / project-specific permits",
      "legal_basis_status": "permits-not-fully-verified",
      "legal_pathways": [
        "privado"
      ],
      "legal_source_urls": [
        "https://www.vasguatemala.com/noticias",
        "https://www.prensalibre.com/economia/vas-cumple-10-anos-y-anuncia-dos-nuevas-opciones-para-los-usuarios-incluida-una-para-facilitar-el-pago/"
      ],
      "name": "VAS · Voie alternative du Sud",
      "summary": "Réseau routier privé en exploitation ; référence pour le développement et la gestion routière.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Privé",
      "mechanism_key": "Privado",
      "funding_source": null,
      "stage": "En exploitation",
      "stage_key": "En operación",
      "owner": "Opérateur privé VAS",
      "location": "Sud de l’aire métropolitaine",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Aucun CAPEX comparable vérifié",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "operation",
      "participation_guidance": "Technologies de péage, maintenance et services aux usagers.",
      "next_step": "Suivre les actualités de l’exploitant et consulter ses procédures fournisseurs pour les services ou extensions annoncées.",
      "url": "https://guatemalainfrastructure.org/projects/vas/fr/",
      "sources": [
        {
          "id": "S15",
          "url": "https://www.vasguatemala.com/noticias",
          "publisher": "VAS",
          "date": null,
          "title": "VAS : réseau routier privé en exploitation"
        },
        {
          "id": "S16",
          "url": "https://www.prensalibre.com/economia/vas-cumple-10-anos-y-anuncia-dos-nuevas-opciones-para-los-usuarios-incluida-una-para-facilitar-el-pago/",
          "publisher": "Prensa Libre",
          "date": "2026-08-27",
          "title": "VAS : dix ans et trois tronçons"
        }
      ]
    },
    {
      "id": "xochi",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Contratación privada / private procurement · permisos por proyecto / project-specific permits",
      "legal_basis_status": "permits-not-fully-verified",
      "legal_pathways": [
        "privado"
      ],
      "legal_source_urls": [
        "https://www.prensalibre.com/guatemala/xochi-abre-oficialmente-y-activa-nueva-conexion-estrategica-en-la-costa-sur/"
      ],
      "name": "Xochi · Corredor de las Flores",
      "summary": "Première phase ouverte au public en juin 2026.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Privé",
      "mechanism_key": "Privado",
      "funding_source": null,
      "stage": "En exploitation",
      "stage_key": "En operación",
      "owner": "Promoteur et opérateur privé de Xochi",
      "location": "Suchitepéquez · Retalhuleu",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Aucun CAPEX comparable vérifié",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "operation",
      "participation_guidance": "Exploitation routière, télépéage, maintenance et services logistiques.",
      "next_step": "Contacter l’exploitant pour connaître les exigences fournisseurs et les possibilités de coopération liées à l’exploitation.",
      "url": "https://guatemalainfrastructure.org/projects/xochi/fr/",
      "sources": [
        {
          "id": "S17",
          "url": "https://www.prensalibre.com/guatemala/xochi-abre-oficialmente-y-activa-nueva-conexion-estrategica-en-la-costa-sur/",
          "publisher": "Prensa Libre",
          "date": "2026-06-14",
          "title": "Xochi : ouverture au public"
        }
      ]
    },
    {
      "id": "verde",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Contratación privada / private procurement · permisos por proyecto / project-specific permits",
      "legal_basis_status": "permits-not-fully-verified",
      "legal_pathways": [
        "privado"
      ],
      "legal_source_urls": [
        "https://lahora.gt/nacionales/hloarca/2026/07/05/de-san-cristobal-a-zona-11-en-15-minutos-avanza-construccion-de-nueva-ruta-con-paso-subterraneo/"
      ],
      "name": "Corredor Verde",
      "summary": "Liaison privée entre San Cristóbal et le Periférico ; construction signalée.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Privé",
      "mechanism_key": "Privado",
      "funding_source": null,
      "stage": "Construction signalée",
      "stage_key": "Construcción reportada",
      "owner": "Corredor Verde, S.A. · autorisations municipales applicables",
      "location": "Mixco · zone 11 de Guatemala",
      "amount_usd_millions": 65.33547807929375,
      "amount_display": "≈ US$65,3 M",
      "amount_basis": "Minimum annoncé · équivalent approximatif en USD",
      "amount_source_date": "Jul. 2026",
      "source_amount": 500,
      "source_currency": "GTQ",
      "converted_to_usd": true,
      "participation_status": "delivery",
      "participation_guidance": "Génie civil, ouvrages, drainage et fournitures de construction.",
      "next_step": "Consulter le promoteur sur le périmètre des travaux et ses procédures d’achat privées avant de proposer des fournitures ou services.",
      "url": "https://guatemalainfrastructure.org/projects/verde/fr/",
      "sources": [
        {
          "id": "S18",
          "url": "https://lahora.gt/nacionales/hloarca/2026/07/05/de-san-cristobal-a-zona-11-en-15-minutos-avanza-construccion-de-nueva-ruta-con-paso-subterraneo/",
          "publisher": "La Hora",
          "date": "2026-07-05",
          "title": "Corredor Verde : construction et investissement annoncé"
        }
      ]
    },
    {
      "id": "aero",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "12-2002 · arts. 73–76 + 57-92 · art. 96 · DAJ-003-2021",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "municipal"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/assets/uploads/info_legislativo/diario_de_sesiones/d3731-diario-final-so_076_24-11-2021.pdf"
      ],
      "name": "AeroMetro · concession municipale",
      "summary": "Concession de transport par câble ; construction et bouclage financier signalés.",
      "sector": "Mobilité",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "Concession municipale",
      "mechanism_key": "Concesión municipal",
      "funding_source": null,
      "stage": "Construction signalée",
      "stage_key": "Construcción reportada",
      "owner": "Municipalité de Guatemala · Cablevía et groupement concessionnaire ; coordination avec Mixco",
      "location": "Guatemala · Mixco",
      "amount_usd_millions": 220,
      "amount_display": "US$220 M",
      "amount_basis": "Estimation publiée par le promoteur",
      "amount_source_date": "Página consultada nov. 2026",
      "source_amount": 220,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Systèmes électromécaniques, stations, intégration urbaine et formation à l’exploitation.",
      "next_step": "Consulter le concessionnaire sur les étapes de réalisation et les exigences de sa chaîne de fournisseurs.",
      "url": "https://guatemalainfrastructure.org/projects/aero/fr/",
      "sources": [
        {
          "id": "S12",
          "url": "https://www.aerometro.gt/",
          "publisher": "Cablevía / AeroMetro",
          "date": null,
          "title": "AeroMetro : promoteur du projet"
        },
        {
          "id": "S13",
          "url": "https://www.deloitte.com/latam/es/services/financial-advisory/perspectives/deloitte-trusted-advisor-aerometro-guatemala.html",
          "publisher": "Deloitte",
          "date": "2026",
          "title": "AeroMetro : bouclage financier"
        },
        {
          "id": "S14",
          "url": "https://lahora.gt/lh-economia/hloarca/2026/02/05/del-trebol-a-la-zona-9-sin-trafico-la-constructora-del-aerometro-promete-conectar-estos-puntos-en-18-meses/",
          "publisher": "La Hora",
          "date": "2026-02-05",
          "title": "AeroMetro : construction et modèle de concession"
        },
        {
          "id": "S23",
          "url": "https://www.congreso.gob.gt/assets/uploads/info_legislativo/diario_de_sesiones/d3731-diario-final-so_076_24-11-2021.pdf",
          "publisher": "Congreso de la República",
          "date": "2021-11-24",
          "title": "AeroMetro : document législatif de la concession"
        }
      ]
    },
    {
      "id": "uk",
      "portfolio_class": "metroriel-special-regime",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "24-2026 · arts. 2–4 · MetroRiel / FEGUA",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "g2g"
      ],
      "legal_source_urls": [
        "https://www.congreso.gob.gt/noticias_congreso/17465/2026/4"
      ],
      "name": "Metro Riel · coopération Guatemala–Royaume-Uni",
      "summary": "Accord signé en juillet 2026 pour soutenir la préparation et la planification.",
      "sector": "Mobilité",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "Coopération de gouvernement à gouvernement (G2G)",
      "mechanism_key": "G2G",
      "funding_source": null,
      "stage": "Préparation initiale",
      "stage_key": "Preparación temprana",
      "owner": "FEGUA · organisme d’exécution, décret 24-2026 art. 3",
      "location": "Aire métropolitaine de Guatemala",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Aucun CAPEX actuel validé pour cette coopération",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "cooperation",
      "participation_guidance": "Études ferroviaires, intégration urbaine et coopération universitaire.",
      "next_step": "Consulter le cadre de coopération et confirmer l’organisme d’exécution, le périmètre et les procédures publiées avant de préparer une offre.",
      "url": "https://guatemalainfrastructure.org/projects/uk/fr/",
      "sources": [
        {
          "id": "S10",
          "url": "https://www.gov.uk/government/news/guatemala-chooses-uk-as-partner-for-metro-riel",
          "publisher": "British Embassy · GOV.UK",
          "date": "2026-07-14",
          "title": "Guatemala choisit le Royaume-Uni comme partenaire pour Metro Riel"
        },
        {
          "id": "S11",
          "url": "https://agn.gt/que-dice-el-memorando-firmado-entre-guatemala-y-el-reino-unido-sobre-el-proyecto-metrorriel",
          "publisher": "AGN",
          "date": "2026-07-17",
          "title": "Périmètre du mémorandum Guatemala–Royaume-Uni"
        },
        {
          "id": "S32",
          "url": "https://guatemala.gob.gt/presidente-bernardo-arevalo-presenta-resultados-de-fase-0-y-hoja-de-ruta-del-proyecto-metroriel/",
          "publisher": "Secretaría de Comunicación Social · Gobierno de Guatemala",
          "date": "2026-10-30",
          "title": "Metro Riel : résultats de la phase 0 et feuille de route"
        }
      ]
    },
    {
      "id": "us-port",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Convenio G2G / G2G agreement · 3-2026 art. 42: alcance por verificar / applicability to verify",
      "legal_basis_status": "agreement-scope-pending",
      "legal_pathways": [
        "g2g"
      ],
      "legal_source_urls": [
        "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
        "https://gae.gob.gt/wp-content/uploads/2026/04/Decreto-3-2026.pdf"
      ],
      "name": "Puerto Quetzal · coopération USACE",
      "summary": "Coopération pour la modernisation portuaire et les études de liaison ferroviaire.",
      "sector": "Ports et logistique",
      "sector_key": "Puertos y logística",
      "sector_slug": "ports-logistics",
      "mechanism": "Coopération de gouvernement à gouvernement (G2G)",
      "mechanism_key": "G2G",
      "funding_source": null,
      "stage": "Préparation initiale",
      "stage_key": "Preparación temprana",
      "owner": "Mindef · CIV · USACE ; coordination portuaire avec EPQ à préciser dans les instruments",
      "location": "Puerto Quetzal · Escuintla",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Aucun CAPEX validé par composante",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "cooperation",
      "participation_guidance": "Ingénierie portuaire, études maritimes et formation technique.",
      "next_step": "Consulter EPQ sur le périmètre public de la coopération et confirmer l’institution chargée de chaque étude ou marché.",
      "url": "https://guatemalainfrastructure.org/projects/us-port/fr/",
      "sources": [
        {
          "id": "S08",
          "url": "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
          "publisher": "AGN",
          "date": "2026-01-15",
          "title": "Coopération USACE : lettres d’acceptation"
        }
      ]
    },
    {
      "id": "us-road",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "Convenio G2G / G2G agreement · 3-2026 art. 42: alcance por verificar / applicability to verify",
      "legal_basis_status": "agreement-scope-pending",
      "legal_pathways": [
        "g2g"
      ],
      "legal_source_urls": [
        "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
        "https://gae.gob.gt/wp-content/uploads/2026/04/Decreto-3-2026.pdf"
      ],
      "name": "Programme routier · coopération USACE",
      "summary": "Six interventions annoncées ; avancement actuel et lots à confirmer.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Coopération de gouvernement à gouvernement (G2G)",
      "mechanism_key": "G2G",
      "funding_source": null,
      "stage": "Préparation initiale",
      "stage_key": "Preparación temprana",
      "owner": "Mindef · CIV · USACE",
      "location": "Plusieurs départements",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Financement de coopération non assimilé au CAPEX de chaque ouvrage",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "cooperation",
      "participation_guidance": "Études routières, ingénierie des échangeurs et assistance technique.",
      "next_step": "Demander au CIV les informations publiques sur les composantes, études et entité acheteuse ; suivre les procédures publiées.",
      "url": "https://guatemalainfrastructure.org/projects/us-road/fr/",
      "sources": [
        {
          "id": "S08",
          "url": "https://agn.gt/unidos-estamos-construyendo-oportunidades-alianza-guatemala-ee-uu-apuesta-por-carreteras-y-puertos/",
          "publisher": "AGN",
          "date": "2026-01-15",
          "title": "Coopération USACE : lettres d’acceptation"
        },
        {
          "id": "S09",
          "url": "https://agn.gt/cuerpo-de-ingenieros-del-ejercito-de-estados-unidos-ya-se-organiza-para-la-construccion-de-proyectos-viales-prioritarios-en-guatemala/",
          "publisher": "AGN",
          "date": "2026-05-25",
          "title": "USACE : six interventions routières annoncées"
        }
      ]
    },
    {
      "id": "ca9-teculutan-mayuelas",
      "portfolio_class": "other",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "24-2025 · 6027/OC-GU · cláusulas 4.03–4.05 · BID",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "multilateral"
      ],
      "legal_source_urls": [
        "https://www.iadb.org/es/proyecto/GU-L1189",
        "https://guatemalainfrastructure.org/laws/loan-6027-oc-gu-original.pdf"
      ],
      "name": "CA-9 Nord · Teculután–Mayuelas",
      "summary": "Élargissement à quatre voies dans le Zacapa pour améliorer l’accès aux ports de l’Atlantique et la résilience aux inondations.",
      "sector": "Routes",
      "sector_key": "Carreteras",
      "sector_slug": "roads",
      "mechanism": "Travaux publics sur financement multilatéral",
      "mechanism_key": "Obra pública con financiamiento multilateral",
      "funding_source": "Prêt souverain de la BID",
      "stage": "En contratación",
      "stage_key": "En contratación",
      "owner": "CIV · DGC · UCP",
      "location": "Teculután · Río Hondo · Gualán (Mayuelas), Zacapa",
      "amount_usd_millions": 350,
      "amount_display": "US$350 M",
      "amount_basis": "Financement approuvé pour l’ensemble du programme",
      "amount_source_date": "2025-07-23",
      "source_amount": 350,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "procurement",
      "participation_guidance": "Bureaux d’ingénierie expérimentés en supervision de travaux routiers.",
      "next_step": "Consulter l’avis 39755 et ses modifications pour confirmer les conditions, l’heure et les modalités de dépôt.",
      "url": "https://guatemalainfrastructure.org/projects/ca9-teculutan-mayuelas/fr/",
      "sources": [
        {
          "id": "S33",
          "url": "https://www.iadb.org/es/proyecto/GU-L1189",
          "publisher": "BID",
          "date": "2025-07-23",
          "title": "BID · programme GU-L1189"
        },
        {
          "id": "S34",
          "url": "https://data.iadb.org/es/api/action/datastore_search?resource_id=856aabfd-2c6a-48fb-a8b8-19f3ff443618&q=39755",
          "publisher": "BID",
          "date": "2026-11-19",
          "title": "BID · registre de l’avis 39755"
        },
        {
          "id": "S35",
          "url": "https://www.congreso.gob.gt/detalle_pdf/decretos/13687",
          "publisher": "Congreso de la República",
          "date": "2025-12-15",
          "title": "Congrès · décret d’approbation 24-2025"
        },
        {
          "id": "S36",
          "url": "https://www.iadb.org/idb-pdf-proxy/EZIDB0000366-2056220512-10172",
          "publisher": "BID",
          "date": "2026-01-21",
          "title": "BID · contrat de prêt 6027/OC-GU"
        },
        {
          "id": "S37",
          "url": "https://www.congreso.gob.gt/noticias_congreso/15038/2026/4",
          "publisher": "Congreso de la República",
          "date": null,
          "title": "Congrès · couverture territoriale CA-9"
        }
      ]
    },
    {
      "id": "onu-estadio",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "17-2000 · Acuerdo Básico PNUD · CDAG/PNUD 01005569 · POPP",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.undp.org/es/guatemala/comunicados-de-prensa/unidos-por-el-deporte-cdag-y-pnud-en-guatemala-firman-convenio-para-fortalecer-el-deporte-nacional-como-catalizador",
        "https://www.ungm.org/Public/Notice/316749",
        "https://www.ungm.org/Public/Notice/320250"
      ],
      "name": "Modernisation du stade Doroteo Guamuch Flores",
      "summary": "Modernisation sportive sous convention CDAG–PNUD. Supervision : échéance le 3 décembre 2026 ; travaux : clôture le 19 novembre.",
      "sector": "Bâtiments publics",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "Système des Nations Unies",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "En contratación",
      "stage_key": "En contratación",
      "owner": "CDAG · PNUD",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "procurement",
      "participation_guidance": "Construction, supervision, ingénierie et services par lot.",
      "next_step": "Vérifier avis, modifications et attributions. Une échéance passée n’accepte plus d’offres ; confirmer la suite auprès de l’agence.",
      "url": "https://guatemalainfrastructure.org/projects/onu-estadio/fr/",
      "sources": [
        {
          "id": "UN-onu-estadio-0",
          "url": "https://www.undp.org/es/guatemala/comunicados-de-prensa/unidos-por-el-deporte-cdag-y-pnud-en-guatemala-firman-convenio-para-fortalecer-el-deporte-nacional-como-catalizador",
          "publisher": "PNUD",
          "date": null,
          "title": "Modernisation du stade Doroteo Guamuch Flores"
        },
        {
          "id": "UN-onu-estadio-1",
          "url": "https://www.ungm.org/Public/Notice/316749",
          "publisher": "UNGM",
          "date": null,
          "title": "Modernisation du stade Doroteo Guamuch Flores"
        },
        {
          "id": "UN-onu-estadio-2",
          "url": "https://www.ungm.org/Public/Notice/320250",
          "publisher": "UNGM",
          "date": null,
          "title": "Modernisation du stade Doroteo Guamuch Flores"
        }
      ]
    },
    {
      "id": "onu-igss-zona5",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "IGSS / UNOPS · INFRAIGSS · RFP/2026/63797",
      "legal_basis_status": "agreement-basis-pending",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.ungm.org/Public/Notice/309929",
        "https://www.unops.org/es/news-and-stories/news/strengthening-igss-hospital-network-in-guatemala",
        "https://proyectosguatemala.org/infraigss"
      ],
      "name": "Hôpital général IGSS zone 5",
      "summary": "Infrastructure hospitalière INFRAIGSS. Appel clos le 1er octobre 2026 ; attribution et démarrage à confirmer.",
      "sector": "Bâtiments publics",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "Système des Nations Unies",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Stade à confirmer",
      "stage_key": "Etapa por confirmar",
      "owner": "IGSS · UNOPS · INFRAIGSS",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Construction, supervision, ingénierie et services par lot.",
      "next_step": "Vérifier avis, modifications et attributions. Une échéance passée n’accepte plus d’offres ; confirmer la suite auprès de l’agence.",
      "url": "https://guatemalainfrastructure.org/projects/onu-igss-zona5/fr/",
      "sources": [
        {
          "id": "UN-onu-igss-zona5-0",
          "url": "https://www.ungm.org/Public/Notice/309929",
          "publisher": "UNGM",
          "date": "2026-08-06",
          "title": "Hôpital général IGSS zone 5"
        },
        {
          "id": "UN-onu-igss-zona5-1",
          "url": "https://www.unops.org/es/news-and-stories/news/strengthening-igss-hospital-network-in-guatemala",
          "publisher": "UNOPS",
          "date": null,
          "title": "Hôpital général IGSS zone 5"
        },
        {
          "id": "UN-onu-igss-zona5-2",
          "url": "https://proyectosguatemala.org/infraigss",
          "publisher": "PNUD",
          "date": null,
          "title": "Hôpital général IGSS zone 5"
        }
      ]
    },
    {
      "id": "onu-igss-zacapa",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "IGSS / UNOPS · INFRAIGSS · RFP/2025/58992",
      "legal_basis_status": "agreement-basis-pending",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.ungm.org/Public/ContractAward/156640",
        "https://www.ungm.org/Public/ContractAward/156638",
        "https://www.ungm.org/Public/Notice/280228"
      ],
      "name": "Hôpital régional de l’Est · IGSS Zacapa",
      "summary": "Travaux hospitaliers attribués selon UNGM le 24 novembre 2026. L’attribution ne prouve pas le démarrage ni l’avancement physique.",
      "sector": "Bâtiments publics",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "Système des Nations Unies",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Adjudicado",
      "stage_key": "Adjudicado",
      "owner": "IGSS · UNOPS · INFRAIGSS",
      "location": "Zacapa · Zacapa",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Construction, supervision, ingénierie et services par lot.",
      "next_step": "Vérifier avis, modifications et attributions. Une échéance passée n’accepte plus d’offres ; confirmer la suite auprès de l’agence.",
      "url": "https://guatemalainfrastructure.org/projects/onu-igss-zacapa/fr/",
      "sources": [
        {
          "id": "UN-onu-igss-zacapa-0",
          "url": "https://www.ungm.org/Public/ContractAward/156640",
          "publisher": "UNGM",
          "date": "2026-11-24",
          "title": "Hôpital régional de l’Est · IGSS Zacapa"
        },
        {
          "id": "UN-onu-igss-zacapa-1",
          "url": "https://www.ungm.org/Public/ContractAward/156638",
          "publisher": "UNGM",
          "date": null,
          "title": "Hôpital régional de l’Est · IGSS Zacapa"
        },
        {
          "id": "UN-onu-igss-zacapa-2",
          "url": "https://www.ungm.org/Public/Notice/280228",
          "publisher": "UNGM",
          "date": null,
          "title": "Hôpital régional de l’Est · IGSS Zacapa"
        }
      ]
    },
    {
      "id": "onu-semaforos",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "PNUD / MuniJoven · 36-2024 art.105(c) / 3-2026 art.17",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.undp.org/es/guatemala/noticias/en-el-marco-del-proyecto-munijoven-la-municipalidad-de-guatemala-y-el-pnud-en-guatemala-continuan-cooperacion-en-la-implementacion",
        "https://muniguatealfrente.com/la-red-de-semaforos-conectados-alcanza-el-90-de-avance/",
        "https://dca.gob.gt/noticias-guatemala-diario-centro-america/muni-instala-220-aparatos-inteligentes/"
      ],
      "name": "Feux intelligents · Ville de Guatemala",
      "summary": "Mise en œuvre municipale avec PNUD/MuniJoven. La municipalité indique 459 carrefours sur 511 en service au 23 novembre 2026 ; aucun nouvel appel ouvert vérifié.",
      "sector": "Mobilité",
      "sector_key": "Movilidad",
      "sector_slug": "mobility",
      "mechanism": "Système des Nations Unies",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Réalisation signalée",
      "stage_key": "Ejecución reportada",
      "owner": "Municipalidad de Guatemala · PNUD/MuniJoven",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "delivery",
      "participation_guidance": "Construction, supervision, ingénierie et services par lot.",
      "next_step": "Vérifier avis, modifications et attributions. Une échéance passée n’accepte plus d’offres ; confirmer la suite auprès de l’agence.",
      "url": "https://guatemalainfrastructure.org/projects/onu-semaforos/fr/",
      "sources": [
        {
          "id": "UN-onu-semaforos-0",
          "url": "https://www.undp.org/es/guatemala/noticias/en-el-marco-del-proyecto-munijoven-la-municipalidad-de-guatemala-y-el-pnud-en-guatemala-continuan-cooperacion-en-la-implementacion",
          "publisher": "PNUD",
          "date": "2026-11-23",
          "title": "Feux intelligents · Ville de Guatemala"
        },
        {
          "id": "UN-onu-semaforos-1",
          "url": "https://muniguatealfrente.com/la-red-de-semaforos-conectados-alcanza-el-90-de-avance/",
          "publisher": "Municipalidad de Guatemala",
          "date": null,
          "title": "Feux intelligents · Ville de Guatemala"
        },
        {
          "id": "UN-onu-semaforos-2",
          "url": "https://dca.gob.gt/noticias-guatemala-diario-centro-america/muni-instala-220-aparatos-inteligentes/",
          "publisher": "PNUD",
          "date": null,
          "title": "Feux intelligents · Ville de Guatemala"
        }
      ]
    },
    {
      "id": "onu-pachalum-preinversion",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "MARN / PNUD / GEF · Motagua 92858 · CI92858-006-2026",
      "legal_basis_status": "agreement-basis-pending",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
        "https://www.undp.org/es/guatemala/proyectos/gestion-ambiental-integral-de-la-cuenca-del-rio-motagua",
        "https://marn.gob.gt/wp-content/uploads/2026/11/Proceso-CI-92858-012-2026-TdR-Facilitacion-Mesas-Panel-Motagua-publicacion.pdf"
      ],
      "name": "Préinvestissement déchets · Pachalum",
      "summary": "Étude de préfaisabilité du programme Motagua MARN–PNUD–GEF, en cours jusqu’en décembre 2026. Résultat de l’étude et marché de travaux non vérifiés.",
      "sector": "Assainissement",
      "sector_key": "Saneamiento",
      "sector_slug": "water-waste",
      "mechanism": "Système des Nations Unies",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Préparation initiale",
      "stage_key": "Preparación temprana",
      "owner": "MARN · PNUD · GEF · Proyecto Motagua92858",
      "location": "Pachalum · Quiché",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Construction, supervision, ingénierie et services par lot.",
      "next_step": "Vérifier avis, modifications et attributions. Une échéance passée n’accepte plus d’offres ; confirmer la suite auprès de l’agence.",
      "url": "https://guatemalainfrastructure.org/projects/onu-pachalum-preinversion/fr/",
      "sources": [
        {
          "id": "UN-onu-pachalum-preinversion-0",
          "url": "https://www.marn.gob.gt/Descargar/1588/proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum/31295/convocatoria-proceso-ci-92858-006-2026-tdr-prefactibilidad-giryds-pachalum.pdf",
          "publisher": "MARN",
          "date": null,
          "title": "Préinvestissement déchets · Pachalum"
        },
        {
          "id": "UN-onu-pachalum-preinversion-1",
          "url": "https://www.undp.org/es/guatemala/proyectos/gestion-ambiental-integral-de-la-cuenca-del-rio-motagua",
          "publisher": "PNUD",
          "date": null,
          "title": "Préinvestissement déchets · Pachalum"
        },
        {
          "id": "UN-onu-pachalum-preinversion-2",
          "url": "https://marn.gob.gt/wp-content/uploads/2026/11/Proceso-CI-92858-012-2026-TdR-Facilitacion-Mesas-Panel-Motagua-publicacion.pdf",
          "publisher": "MARN",
          "date": null,
          "title": "Préinvestissement déchets · Pachalum"
        }
      ]
    },
    {
      "id": "onu-comedores",
      "portfolio_class": "un-system",
      "classification_reviewed": "2026-11-25",
      "legal_basis": "MIDES / PNUD 01002876 · 36-2024 art.105(b) / 3-2026 art.17",
      "legal_basis_status": "documented",
      "legal_pathways": [
        "onu"
      ],
      "legal_source_urls": [
        "https://www.ungm.org/Public/Notice/315032",
        "https://www.ungm.org/Public/Notice/312137",
        "https://www.mides.gob.gt/images/uip/ipublica/29/ApoyoMIDES-PNUD-2024.pdf"
      ],
      "name": "Réhabilitation des cantines sociales FEGUA et Roosevelt",
      "summary": "Réhabilitation sanitaire, ventilation et électricité du projet MIDES–PNUD 01002876. Appels clos ; attribution et réalisation à confirmer. Deux sites dans une fiche.",
      "sector": "Bâtiments publics",
      "sector_key": "Edificación pública",
      "sector_slug": "public-buildings",
      "mechanism": "Système des Nations Unies",
      "mechanism_key": "Sistema de Naciones Unidas",
      "funding_source": null,
      "stage": "Stade à confirmer",
      "stage_key": "Etapa por confirmar",
      "owner": "MIDES · PNUD · Proyecto01002876",
      "location": "Guatemala · Guatemala",
      "amount_usd_millions": null,
      "amount_display": "À confirmer",
      "amount_basis": "Sin monto comparable verificado",
      "amount_source_date": null,
      "source_amount": null,
      "source_currency": "USD",
      "converted_to_usd": false,
      "participation_status": "preparation",
      "participation_guidance": "Construction, supervision, ingénierie et services par lot.",
      "next_step": "Vérifier avis, modifications et attributions. Une échéance passée n’accepte plus d’offres ; confirmer la suite auprès de l’agence.",
      "url": "https://guatemalainfrastructure.org/projects/onu-comedores/fr/",
      "sources": [
        {
          "id": "UN-onu-comedores-0",
          "url": "https://www.ungm.org/Public/Notice/315032",
          "publisher": "UNGM",
          "date": "2026-09-21",
          "title": "Réhabilitation des cantines sociales FEGUA et Roosevelt"
        },
        {
          "id": "UN-onu-comedores-1",
          "url": "https://www.ungm.org/Public/Notice/312137",
          "publisher": "UNGM",
          "date": null,
          "title": "Réhabilitation des cantines sociales FEGUA et Roosevelt"
        },
        {
          "id": "UN-onu-comedores-2",
          "url": "https://www.mides.gob.gt/images/uip/ipublica/29/ApoyoMIDES-PNUD-2024.pdf",
          "publisher": "MIDES",
          "date": null,
          "title": "Réhabilitation des cantines sociales FEGUA et Roosevelt"
        }
      ]
    }
  ]
}