Explore projects and their municipalities, alongside visual references to their progress.
Territorial explorer
Projects in their geographic context.
Select a point or profile. Points locate reference localities; they do not represent approved project land, alignments or boundaries. Regional programmes may appear at several localities.
Prensa Libre documents installed equipment at three Line 1 stations and the cable’s arrival. Cable installation in February and operation in August 2027 are project forecasts, not completed milestones.
Visualisation published in ANI’s project profile: connection to CA-1 at km 23. Reference design, not a photograph of completed works or an approved final alignment.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image from ANI’s 2026 Sector Plan. It illustrates the proposed type of infrastructure, not completed works, an exact location or an approved final design. The date refers to the document.
Image published by AGN, credited to CIV, with news of the Teculután–Mayuelas loan. It shows the existing corridor, not the completed expansion. Date of publication.
Photograph of the letter of offer and acceptance, published by AGN in coverage of preparations for six road projects with USACE. It documents cooperation, not construction progress. Date of publication.
33 potential ANI projects; 10 selected with published profiles. The other 23 are not added to the catalogue without individual identification. Not selected does not mean cancelled.
MetroRiel · special regime, outside the ANI 2026 selection
One profile is retained under Decree 24-2026 and G2G cooperation. Its ANADIE history does not create another project or count towards the ten selected projects.
The plan declares 33 but its text adds 24 + 8. Radial 6: US$158 M in an undated profile versus US$650 M in the 2026 plan; the selected reference is retained with this discrepancy disclosed. Norte–Oriente, Vía Exprés and other corridors require alignment comparison before asserting equivalence. CA-9 Teculután–Mayuelas retains its IDB loan profile: DIPP road scope does not automatically replace loan rules.
DIPP · potential scope under Article 87
Legal references, not 20 tenders or 20 structured projects. Excluded from dashboard profile counts and amounts. ANI identifies Arco 18, Arco Norte and Vía Exprés as initiatives incorporated into this regime.
Libramiento CA-9 Norte–CA-1 Oriente / Vía ExprésArt. 87 n
Corredor Arco 18Art. 87 n
Arco Norte MetropolitanoArt. 87 n
Anillo MetropolitanoArt. 87 o
Anillo Regional C-50Art. 87 p
Anillo RegionalArt. 87 q
ANI historical entries · current status unconfirmed
Published in the structuring section. Not added to the 33 or presented as current opportunities. The historical mass-transit entry is reconciled with MetroRiel, without duplication.