A quick guide to what to watch, how to prepare and where to find the official notice.
Last targeted review: 2026-11-25Editorial review every 14 days · Next planned: 2026-12-11
Where your firm can participate
The portfolio combines future PPPs, G2G project preparation and contracts already under implementation. For investors, the key signal is a formal prequalification or tender; engineering and advisory firms should also watch studies, advice and supervision packages. The buyer’s documents establish the actual packages and requirements.
Procurement of works supervision services, separate from construction contract UNDP-GTM-00294. Both processes belong to one stadium improvement project.
Published · 2026-10-29
CDAG · PNUD · UNDP-GTM-00300
Deadline: December 3, 2026 at 16:00 (Guatemala) · Verified: 2026-11-27
Electrical package for the FEGUA and Roosevelt dining facilities. A separate contract from plumbing, refurbishment and ventilation, not an additional project.
Published · 2026-08-24
MIDES · PNUD · Proyecto01002876 · UNDP-GTM-00286
Deadline: September 14, 2026 at 10:00 (Guatemala) · Verified: 2026-11-27
Partial review on 27 November 2026: ANI, operators, cooperation and UNGM sources consulted. Guatecompras and MINFIN denied access; FEGUA and ANI/IDB documents did not load. Previous facts and verification dates for those sources are retained; this does not confirm the absence of tenders.
Procurement watchlist
Structuring / assessment
ANI · ten PPP initiatives
Demand studies, feasibility, engineering, transaction advice and future investment processes, subject to specific notices.
Escuintla–Puerto Quetzal, AeroMetro, VAS, Xochi and Corredor Verde: consult the concessionaire or developer about specific packages; these are not presented as new open concessions.
IDB country office, country strategy and project portfolio in Guatemala. To participate in procurement, consult the notice and the relevant executing agency.
Filter by Guatemala and search for the project or package. Check deadlines, tender documents, clarifications and the buyer’s channel for questions and bids.
Anticipate works, goods and consulting packages; filter by country and project. For Teculután–Mayuelas, search GU-L1189 / 6027/OC-GU. A planned process is not an open call.
Each review checks announcements, expressions of interest, prequalification, tender documents, extensions, cancellations and awards. The public buyer’s latest publication takes priority. Supplementary sources provide context for specific projects; only an official notice supports a solicitation status. Readers should check deadlines between reviews.
2026-11-27 · Partial review: no newly verified notices. Stadium supervision deadline reconfirmed for 3 December 2026 at 16:00 Guatemala time. Added an AeroMetro construction milestone, 2027 legal monitoring and the 27 November Banguat exchange rate.
2026-11-24 · Supervision notice 39755
2026-11-13 · Procurement monitoring established for the Atlas’s 18 profiles and their publication channels.
Water, sanitation, ventilation and electrical rehabilitation under MIDES–UNDP project 01002876. Calls closed; award and physical execution unverified. Two facilities in one profile.