Four-lane widening in Zacapa to improve access to the Atlantic ports and resilience to flooding.
Background
Image published by AGN, credited to CIV, with news of the Teculután–Mayuelas loan. It shows the existing corridor, not the completed expansion. Date of publication.
Approved by IDB on 23 July 2025; agreement signed on 21 January 2026. Executed by CIV through DGC and UCP.
IDB lists the programme as in implementation. The Atlas shows the identified supervision procurement; this does not confirm that physical construction has begun.
Road infrastructure, land and environmental/social management
US$337.00 M
Nature-based solutions
US$5.00 M
Pre-investment and capacity development
US$3.45 M
Programme administration
US$4.55 M
Original allocation in the Sole Annex, section III. These are whole-programme funds, not a tender value. Component allocations may change under the agreement.
Includes four-lane widening, bridges and road safety; land and environmental/social management; watershed resilience; and studies and capacity development, including designs for remaining sections to Puerto Barrios. Those studies do not imply financed works along the entire corridor.
Amounts in millions of US dollars (USD). Quetzal conversion: 1 USD = GTQ 7.65281 · Banco de Guatemala · 2026-11-27. Approximate values; each estimate retains its source date and basis.
Participation pathway
Procurement of services
En contratación
Public works with multilateral financing
US$350 M · Approved financing for the entire programme
CIV · DGC · UCP
Expertise you can contribute
Engineering firms experienced in road construction supervision.
Next step
Check notice 39755 and its amendments for requirements, submission time and delivery instructions.
The project stage does not confirm that contracts are available. Check the current call or confirm the channel and conditions with the counterpart.